Peakflow Forecasts Header

BULLY CREEK--BULLY CREEK DAM
   State:  Oregon    County:  MALHEUR
   Latitude:  44 1' 50" North    Longitude:  117 24' 45" West
   Elevation:  2500 feet
   Supporting WFO:  Boise    
   Inflow Data  

Forecasts are calculated from a forecast time series that approximates flow at a 6 hour time step interval. Observed instantaneous peaks can be higher than model forecast peaks.

BULLY CREEK--BULLY CREEK DAM   (BULO3)
Forecasts for Water Year
2025
Ensemble Date: 2025-07-11
Forecast Period: July 11 to November 1
Exceedence
Probability
Inflow
CFS
Probable
Date of Peak
95 % 0 2025-07-11
90 % 0 2025-07-11
70 % 2 2025-10-23
50 % 2 2025-10-29
30 % 4 2025-10-31
10 % 8 2025-11-01
05 % 9 2025-11-01

Peakflow exceedence plot for BULO3

 Click to download runoff traces used in forecast.  Click for comma delimited data used in plot.csv icon