Peakflow Forecasts Header

BEAR CREEK--AT MEDFORD
   State:  Oregon    County:  JACKSON
   Latitude:  42 19' 59" North    Longitude:  122 52' 0" West
   Elevation:  1342 feet
   Supporting WFO:  Medford    
   Action Stage:  8'   Flood Stage:  10'   Moderate Flood Stage:  13'
   Major Flood Stage:  
14'

Forecasts are calculated from a forecast time series that approximates flow at a 6 hour time step interval. Observed instantaneous peaks can be higher than model forecast peaks.

BEAR CREEK--AT MEDFORD   (MFDO3)
Forecasts for Water Year
2025
Ensemble Date: 2025-07-03
Forecast Period: July 3 to November 1
Exceedence
Probability
Stage
feet
Discharge
CFS
Probable
Date of Peak
95 % 2.95 83 2025-07-18
90 % 2.95 84 2025-08-08
70 % 3.10 118 2025-09-24
50 % 3.22 149 2025-10-05
30 % 3.32 178 2025-10-20
10 % 3.60 278 2025-10-29
05 % 3.72 322 2025-11-01

Peakflow exceedence plot for MFDO3

 Click to download runoff traces used in forecast.  Click for comma delimited data used in plot.csv icon